DLNews traffic:
The City of Indio will be repaving various city streets, including portions of Oasis St, Madison St, Highway 111, Bristol St, Kenner Ave, and Dr. Carreon Blvd, between March 17, 2023, to March 31, 2023. Construction will occur between 7:00 a.m. and 4:00 p.m., Mondays to Fridays.
Residents and motorists should expect significant travel delays, as traffic will be reduced to one lane during construction. Road signs for traffic control will be in place, and flaggers will assist with bike/vehicle traffic and pedestrian activity, as needed. Traffic signals at impacted intersections will flash red while the crew is working. The public's cooperation and observance of all construction signs will also be greatly appreciated to ensure the safety of both drivers and construction crews. Access to emergency vehicles will be unaffected.
The residents in the project's vicinity are expected to hear noise and possible vibrations (shaking) from construction activities. Therefore, the construction equipment used for this project will be equipped with backup alarms (beeping) required by state law. The city will coordinate to keep the equipment backing up to a minimum. However, some beeping is to be expected.
This project is part of the City's street maintenance program that restores our streets, extends their service life, and minimizes further deterioration. The work involves:
Removal of existing deteriorated pavement.
Construction of new asphalt pavement.
Adjustment of specific utilities.
Replacing the roadway striping and markings on the new asphalt surface.
The total construction cost for the project is $2,000,000 and is funded by Measure A, Measure X, and City funds. Measure A generates funds for transportation infrastructure in Riverside County through a half-cent sales tax. Measure X is a one-cent sales tax for neighborhood safety and essential services such as, but not limited to, police services, street repair, infrastructure upgrades, and other city services.
Please direct any questions regarding the project to the City of Indio Public Works Department at (760) 391-4017.
Upcoming schedule (subject to change due to weather)
Work hours are 7:00 am – 4:00 pm unless noted otherwise.
Madison St (Avenue 48 to Avenue 49)
Thursday, March 16, 2023
Friday, March 17, 2023
Dr. Carreon Blvd (Calhoun St to Van Buren St)
Monday, March 20, 2023
Bristol St (Dr. Carreon Blvd to Stone Canyon Ave) starts at 9:00 am due to school traffic
Monday, March 20, 2023
Oasis St (Hwy 111 to Wilson St)
Tuesday, March 21, 2023
Wednesday, March 22, 2023
Highway 111 (Golf Center Pkwy to Smurr St)
Tuesday, March 21, 2023
Wednesday, March 22, 2023
Kenner Ave (Adobe St to Jackson St)
Thursday, March 23, 2023
Friday, March 24, 2023
Intermittent traffic control for traffic striping (moves along as they work)
March 30-31, 2023
Share this page with your family and friends.